As mentioned before, Unit Three is a two bedroom house. The bedrooms aren't as bad as the rest of the house, though walls in there will need to be opened up to put insulation in, and new flooring needs to be installed.
Looking into the master bedroom from the hall.
From standing in the closet.
The closet.
Not too much is happening in here, more painting and cleaning as always.
- Walls need to be painted.
- Ceiling may be painted.
- Carpet will be taken up and new flooring will be installed. Unsure of what type of flooring.
- Baseboard heater may be replaced.
- Baseboards need to go up.
- General clean up will happen.
Closet close up.
The baseboard heater.
The Back Bedroom
The back bedroom is smaller than the master bedroom, and there is not quite as much work to do as in the master bedroom, but it's the same type of work.
Looking in from the hall.
The closet.
View from near the closet.
Everything we're doing in here is exactly the same as the master bedroom. The walls need to be insulated, and the floor needs re-doing. The same list as above applies to here. Two more pictures:This is one of the baseboards pulled from the wall. It's rather ugly underneath.
I think there's a black light in there, though I really can't say.
No comments:
Post a Comment