Today, after a couple day break from working on Unit Three, I got back to it. My two brothers came along with me and my dad this time, so we got a bunch of work done.
Monday, May 19, 2008
Hours Worked: 3
Objective of the Day: More Demo Work
We got a lot done today. We pulled up flooring from all parts of the house, got the rest of the baseboards up, and got a all of the wood we've taken down out of our way. The carpet in the living room and bedrooms were completely pulled up, and the linoleum in kitchen was ripped up. After a little mishap involving the deleting and frantic restoration of files, I have pictures of the day.

The storage room has been completely taken down now.

Living room floor with the carpet taken up.

Linoleum in the kitchen being ripped up.

The back bedroom with the carpet taken up.

The master bedroom.

The living room floor, before we ripped up the plywood covering it...

...and after. Strange how when you're working a lot of things tend to get worse before they get better.

The pile of stuff we tore up from the living room floor.

View of the living room from the front door. A lot different from before:

Also, this time I had time to get a picture of the exterior of Unit Three:

That's the sunroom on the back.